Zero Emission Vehicle Infrastructure Program (ZEVIP)

Natural Resources Canada

Up to $2M

fifty percent (50%) of Total Project Costs up to a maximum of 2 million dollars per project

Funds EV chargers and hydrogen refuelling stations in public places, on-street, multi-unit residential buildings, workplaces and fleets, through streams for owners/operators, delivery organizations and Indigenous organizations.

Open the official page ↗
0
Not open

How to apply

Loading…

Who qualifies

Owners and operators of EV charging infrastructure, delivery organizations that redistribute funding, and Indigenous organizations. Smaller charging projects (under 20 level 2 connectors or 2 fast-chargers) are served through delivery organizations; private-sector projects above $20 million are redirected to the Canada Infrastructure Bank.

CorporationNon-profitMunicipalityIndigenous

Good to know

  • Funding: Owners/operators stream. Delivery organizations: up to 50% and $5 million per project. Indigenous organizations: up to 75% and $2 million per project.
  • Cost share: 50% of eligible costs

Evidence from the official page

  • amount“limited to fifty percent (50%) of Total Project Costs up to a” source ↗
  • status“Closed for Applications” source ↗

Verified 2026-10-07 · High confidence. Always confirm on the official page before applying.